Category Archives: Roof

Nearly, but not quite

The first problem of the day was the discovery that we didn’t have enough copper guttering. It took me a few hours to search around Thonon looking for copper at a sensible price. I failed and ended up at Gedimat … Continue reading

Posted in Roof | 1 Comment

Another Day

General progress today. We finished off the fixings on the new part of the ridge, which we had left due to yesterday’s winds. Next we stripped the tin from the valley and clambered about the frame to fix the valley … Continue reading

Posted in Roof | Comments Off

Homertime

After a night of high winds (everything stayed in place) we woke to sunshine and showers. Not fancying final adjustments on the ridge, we began work on the eve. The tongue and groove boards were nailed on. It took a while to … Continue reading

Posted in Roof | Comments Off

Ridge

After a night’s rain we had to clear up. We’d taken the ridge tiles off the completed roof to try to fix the ridge board. The water ran down the inside of the roof on the sarking board and came … Continue reading

Posted in Roof | Comments Off

A day of rest

After nearly 2 continuous weeks work it was time for a bit of a rest. We needed to go to Thonnon to get more snow hooks and make a visit to a nearby friend . Thonnon was as difficult as ever. There … Continue reading

Posted in Roof | Comments Off

On the Verge

We needed our wood delivery, due yesterday. Without this we began clearing the remaining tin around the valley. We stacked the tiles out of the way and checked the state of the ridge. The wood finally arrived at around 12. … Continue reading

Posted in Roof | 3 Comments

Panelling

Our planned delivery of an extra length of wood was delayed until tomorrow. This slowed us down as we couldn’t finish up the rafters and push on. However, we cleared the last of the old wood where the extra piece … Continue reading

Posted in Roof | Comments Off

Bolting

After a little rain last night, we made a slow start. The final set of rafters needed to meet the ridge board and be set at the right height. The ridge pole has seen some damp and worm over the … Continue reading

Posted in Roof | Comments Off

Getting there … slowly

Fixing the lower rafters in place involved measuring the overhang of the eve and keeping them the same. We completed this and stood back to admire the work when we realised the line was all wrong. The eve didn’t line … Continue reading

Posted in Roof | Comments Off

Three Lines

First thing this morning our delivery arrived. We needed some more tongue and groove boards, as some had been used to panel in the kitchen in April. We also needed more battens as last year so many had been used hold down tarps. … Continue reading

Posted in Roof | Comments Off