Monthly Archives: August 2011

On the edge

I returned just for a couple of nights following a meeting in Geneva. Mike Briggs and I spent the morning working on the verge. We stripped the rough cut tiles and then fixed them all with screws. We then marked … Continue reading

Posted in Places, Roof | Comments Off

at last

With a realistic chance of finishing the tiling, I started work at around 9am. In the cool of the morning I tiled a bit before setting about finishing the battens. I needed to sort out exactly what was to happen … Continue reading

Posted in Roof | Comments Off

Sting in the tail

I came down off the roof in the cool evening at around 7:30pm. It was a disappointment that I couldn’t finish today, but it was too big a task. The disappointment was matched by pain as I filled a glass … Continue reading

Posted in Roof | 3 Comments

Dormer Done

Another hot, hot day. The temperature on the ground is over 30. I don’t know what it is on the roof, but I can’t touch the tiles for too long. I can manage about 40 minute in a session, then … Continue reading

Posted in Roof | 1 Comment

So Slow

Missed the blog yesterday. Somehow it seems that nothing much happened, although I spent the whole of yesterday on the roof. In fact a lot has been completed. I soldered the cap on the valleys. A bit of a bodge … Continue reading

Posted in Roof | 3 Comments

Sealed

The dormer sarking board and the T&G were completed. It rained last night, so we needed sheeting on the floor. Now it’s sealed again, the clouds have departed. I also put the copper valley in place, last thing. A few … Continue reading

Posted in Roof | 1 Comment

Up on the roof …

Posted in Roof | 1 Comment

Copper & Jam

I spent the day working under the dormer eve. I cut the tiles to fit up tight to the wall. I panelled the little triangle wall formed by the dormer and the main roof. I made lead soakers and folded them … Continue reading

Posted in Roof | 2 Comments

BBQ Summer

Alone today, after a lie in until 9, I started on the things that are stopping me from tiling; Gutters. I watched the locals who were out in force today, digging up their potatoes. I completed a few jobs on the … Continue reading

Posted in Roof | Comments Off

Looks like backwards

I missed the blog yesterday. There was just too much to do. With Peter leaving today, the pressure was on. The priority has been to get two-man jobs done. These included putting up the long barge and fascia boards. This is difficult, … Continue reading

Posted in Roof | Comments Off